Leigh Grid Sub Station
De commissioning of existing panels replaced by the installation of 2No 400A rated busbars feeding essential supplies to grid site. Switching arrangements via 400A switch fuses complete with castel interlocks
Substation lighting Installation
On this installation the client (a local REC) required the compound and out laying areas of the site to be illuminated. The light levels required were 200lux at ground level.
|
|